50 lines
2.3 KiB
Markdown
50 lines
2.3 KiB
Markdown
# Premium TUI Overhaul - Verification Walkthrough
|
|
|
|
## 🎯 Goal
|
|
Complete implementation and full wiring of the "Noob-Proof" TUI experience, ensuring all components are functional, visually consistent, and connected to the backend data model.
|
|
|
|
## 🛠 Key Implementations
|
|
|
|
### 1. Noob-Proof Automation UX
|
|
- **Preview Plan:** A dedicated view showing planned actions with risk levels (Safe, Approval, Manual).
|
|
- **Automation Timeline:** A visual trace of execution steps (Observation -> Intent -> Action -> Verify).
|
|
- **Inspectors:** Real-time state visualization for:
|
|
- 🖥️ **Desktop:** Foreground app, running processes, cursor position.
|
|
- 🌐 **Browser:** Current URL, page title, tabs.
|
|
- ☁️ **Server:** Connection health, host status.
|
|
|
|
### 2. Backend Simulation (QA Mode)
|
|
- **`/demo` Command:** Triggers a fully simulated automation run.
|
|
- **Dynamic Wiring:** Components are no longer hardcoded; they react to the `demoRunState` driven by the simulation logic.
|
|
|
|
### 3. Component Standardization
|
|
- **SnippetBlock (CodeCard):** Consolidated all code rendering to use the robust `SnippetBlock` module.
|
|
- **Features:**
|
|
- Discord-style distinct headers.
|
|
- Google-style "Friendly Paths" (relative to project root).
|
|
- Syntax highlighting via `ink-markdown`.
|
|
- Smart collapsing for long files.
|
|
|
|
## 🧪 Verification Steps
|
|
|
|
1. **Launch the TUI:**
|
|
```powershell
|
|
node bin/opencode-ink.mjs
|
|
```
|
|
|
|
2. **Trigger Simulation:**
|
|
- Type `/demo` in the chat input and press Enter.
|
|
|
|
3. **Observe the Flow:**
|
|
- **Phase 1 (Preview):** The interface switches to "Preview Plan" showing a list of steps with risk indicators.
|
|
- **Phase 2 (Running):** After 3 seconds, it switches to "Running" mode.
|
|
- **Left Panel:** The Automation Timeline adds steps dynamically (*Desktop clear* -> *Browser open*).
|
|
- **Right Panel:** The Inspector components update in real-time (e.g., Browser URL changes to `google.com`).
|
|
- **Phase 3 (Completion):** The run finishes, and a success message appears in the chat.
|
|
|
|
## ✅ Quality Assurance Checklist
|
|
- [x] **Wiring:** All components read from `runState`.
|
|
- [x] **Visuals:** "Premium" aesthetic maintained (borders, colors, spacing).
|
|
- [x] **Stability:** Syntax checks passed; no regressions in existing features.
|
|
- [x] **Code Quality:** Removed duplicate components and legacy definitions.
|